Things got going early today. By 7:15 am, the pumper truck was on the site. The operator had to park it on the front yard for the job. The boom went over the top of our house to pump the concrete into the forms. A wild sight! One half hour later, the concrete trucks started arriving. 3 trucks in total delivered 23 cubic metres of 25 mpa concrete which was pumped first into the bench footing, then the foundation walls. By 10:30 am, it was all over. Everything went quite smoothly thanks to the crew at Chico's Forming.