Slab Happy

Yesterday John Greco and his crew from The Greco Group began the work of installing the basement floor. After installing the sump pit, they filled the area up to the bottom of the footing with gravel, which they brought in by wheel barrow. It was raining pretty hard by the time they finished so they called it a day.

This morning they filled gravel in and around the outside of the foundation covering the weeping tile. They also installed vapour barrier over the gravel inside where the floor was to be poured. The vapour barrier is designed to stop moisture from coming up under the slab and into the basement. At 8am the concrete truck arrived with 5 meters of 30 mpa concretewhich the crew brought to the back of the house in wheel barrows. It was then poured down a chute, which they had constructed. The slab is to be 4 inches thick. An hour later the concrete was in and the initial finishing of the surface was complete. One of the crew was to stay onsite for the balance of the day and continue to finish the surface as the concrete cured. As there was a chance of rain during the day, the crew erected tarps over the entire area which they left up overnight.

Monday, July 13, 2009

Pump it Up!

Things got going early today. By 7:15 am, the pumper truck was on the site. The operator had to park it on the front yard for the job. The boom went over the top of our house to pump the concrete into the forms. A wild sight! One half hour later, the concrete trucks started arriving. 3 trucks in total delivered 23 cubic metres of 25 mpa concrete which was pumped first into the bench footing, then the foundation walls. By 10:30 am, it was all over. Everything went quite smoothly thanks to the crew at Chico's Forming.



Friday, July 10, 2009

It's All In Your Form!

Today, the guys from Chico's Forming installed the 8 foot forms for the poured concrete foundation walls. The walls once poured, will be 10" wide and 8 feet 1 inch above the footings. Rob, Marco and Bruno got the forms up in no time. Monday we pour concrete!

Friday, July 3, 2009

Solid Footing!

On Thursday July 2nd, our forming contractor (Chico’s Forming) came in and poured concrete into the forms for the footings for the exterior walls of the house. They used a special concrete truck with a conveyor belt type device to move the concrete from the truck to the rear of the house, where they then filled wheelbarrows and poured the footings. Steel rebar was placed in the poured footings where they will tie into the bench footing. Next week they are supposed to come back, erect the forms for the walls and pour the walls and the bench footing at the same time.